Drawing registers
Track drawing identity, discipline, revision, status, issue purpose, and the current accepted version.
02 / Capabilities · 06
Keep current drawings, technical questions, approvals, evidence, and project records connected to the people and work they concern.
Information route
One controlled route from receipt to retained record.
Each stage adds context without erasing what came before. The process stays useful because versions, responsibilities, decisions, and visibility remain connected.
01
Capture the file, question, evidence, or submission with its source and project context.
02
Connect the record to its type, discipline, WBS scope, responsible party, and visibility.
03
Route current information to the people appointed to check, comment, or request revision.
04
Record the decision made by the responsible party without transferring their authority to the system.
Decision by the appointed authority05
Make the accepted version visible to the participants and work scopes permitted to use it.
06
Preserve versions, decisions, evidence, and superseded records as traceable project history.
Superseded versions remain traceableProfessional service
Control the information that directs the work.
Track drawing identity, discipline, revision, status, issue purpose, and the current accepted version.
Coordinate transmittals, review routes, responses, revisions, and supporting product or engineering information.
Keep each question connected to its location, WBS context, responsible participant, response, and resulting action.
Organize requests, evidence, findings, responsible reviews, follow-up, and final recorded status.
Relate reported progress to dated evidence and the review that allows it to become official project information.
Assemble approved drawings, reports, evidence, decisions, and close-out information into a usable final record.
Tomy Engineering establishes and operates the agreed information-control process within the scope of its appointment.
Design responsibility, contractual authority, statutory review, professional certification, safety duties, and final approvals remain with the responsible appointed parties.
Tenage Apps preview
The service defines the process. The platform keeps its record connected.
Tenage Apps is Tomy Engineering's construction-management PWA in development for customers, project Partners, and authorized Tomy Engineering teams. Access follows project membership, platform role, and WBS or work scope.
Customer and Partner views are experiences—not automatic authority. The backend remains responsible for enforcing every permitted action and information boundary.
PROJECT / WBS 03.02
Current informationProgress and work context
Current files and versions
Authorized project proof
Work-specific RFIs
Requests and findings
Responsible decisions
Controlled project views
Traceable record history
File traceability
A file is more useful when its context travels with it.
File bytes belong in approved object storage while the project record retains the metadata and relationships needed to identify, verify, and authorize their use.
Project · WBS branch · record type
Uploader · original name · file type
Version · size · checksum
Role and work-scope permission
Selected Drive source · modified time
Snapshot version · checksum · status
External Google Drive support is limited to selected project files or folders. Snapshot availability depends on source access and copy permission; unavailable backups must be shown honestly rather than marked safe.
Plans & pricing
Choose the information boundary that matches the organization.
Pricing, currencies, usage limits, and commercial terms are still being defined. The comparison below presents the approved licensing direction without implying that checkout is available.
Current direction
A license held by the organization administering one project, whether that organization is an Owner, Main Contractor, Consultant, or another approved participant.
Future direction
A planned organization-level option that can group multiple projects without changing the roles or permissions held inside each project.
Billing remains independent from construction role. Holding a license does not automatically grant unrestricted project access, approval authority, or visibility into another participant’s work.
Project information
Define the rules before asking the record to enforce them.
Information required
Expected records
Related capabilities
Keep technical delivery connected to its current record.
Develop and coordinate clear technical drawings for review, fabrication, and construction use.
02Prepare measured quantities and structured bills of quantities as professional project outputs.
03Use coordinated models and structured information to improve technical clarity across disciplines.
04Connect scope, participants, progress, evidence, and decisions through a disciplined delivery process.
05Keep responsibilities, constructability questions, and technical decisions connected to the work.
Start a conversation
Need a clearer route from project file to authorized record?